To replace 5 tanks that were installed onsite at the water treatment plant that didn’t fit the regulatory requirements, we’re unable to get work safe design registration, and the vessel designs were not listed in the AS/NZS 1200.
- Location:Perth WA
- Industry:Government
What we did
Masterflow designed and engineered 5 500L Expansion Vessels to AS1210 standard with internal EPDM bladders and fixtures, ITP as per AS3920, surface treatment, painting and hydrostatic testing.
The outcome
Masterflow delivered Perth’s biggest water treatment plant with 5 expansion tanks that are compliant to the customers’ needs and standards.